Details of the next smelt listed in the sidebar in “What’s On”
If you would like to see what goes on and/or join the team, please email The Secretary.
The pictures below were taken at our smelt in October 2012.
There have been further smelts during 2013-19, at the Pippingford site, experimenting with different sizes of tuyeres and blowing rates. We have been operating with 2 tuyeres, opposite each other, with a total blowing rate of about 15litres/second, using an electric blower. This blowing rate would be quite hard work using our two hand bellows.
Reports of the 2019 Smelting experiments will be posted soon.
Hover over the image for the details.
Back to: Summary The Ore Ore Preparation The Furnace The Smelt The Bloom Comparison with Ancient Slags Limitations in Analysis References Pictures